project name
Research and Industrial Application of Key Technologies for Real-time Reliability Evaluation of Flow Meters
Â
Project department
Zhejiang Quality and Technical Supervision Bureau
Â
Bear unit
Zhejiang Institute of Metrology
Â
Implementation period
2019-01 to 2020-12
Â
Project leader and team members
Name
job title
employer
Undertake the task
Â
Â
Ma Longbo
Senior engineer
Zhejiang Institute of Metrology
Overall design
Â
Â
Zheng Jianying
Positive height
Zhejiang Institute of Metrology
Construction of gas flowmeter temperature adaptive equipment
Â
Â
Chen Shangshun
Senior engineer
Zhejiang Institute of Metrology
Construction of flow meter real flow electromagnetic compatibility equipment
Â
Â
Wu Xiaojie
engineer
Zhejiang Institute of Metrology
Construction of life reliability equipment for flow meter
Â
Â
Xiang Lei
engineer
Zhejiang Institute of Metrology
Research on Temperature Adaptability Test Method of Gas Flowmeter
Â
Â
Zhang Qian
engineer
Zhejiang Institute of Metrology
Research on Temperature Adaptability Evaluation Method of Gas Flowmeter
Â
Â
Fang Yan
engineer
Zhejiang Institute of Metrology
Research on Lifetime Reliability Evaluation Method of Flow Meter
Â
Â
Chen Chaoyang
Senior engineer
Zhejiang Institute of Metrology
Research on Real-time Electromagnetic Compatibility Test Method of Flow Meter
Â
Â
Chen Guofu
engineer
Zhejiang Institute of Metrology
Research on Evaluation Method of Flowmeter Real Flow Electromagnetic Compatibility
Â
Â
Zhang Ningning
engineer
Zhejiang Institute of Metrology
Research on Evaluation Method of Flow Meter Real Flow Reliability
Â
Total funding
     1.2 million yuan
among them
Appropriation
1 million yuan
Other funding
Source and amount
Party B raises 20.00 (10,000 yuan)
Â
budget
Equipment costs
0.00 million
material fee
80 million yuan
Â
Â
Testing laboratory processing fee
10 million yuan
Fuel power costs
0.00 million
Â
Â
Travel expenses
Ten thousand yuan
conference fee
Ten thousand yuan
Â
Â
Collaborative research and exchange fees
Ten thousand yuan
Service fee
20 thousand yuan
Â
Â
Publishing / Documentation / Information Dissemination / Intellectual Property Affairs
30 million yuan
Expert consulting fee
0.00 million
Â
Â
management fee
20 million yuan
Â
Â
process
information
Funding in place
Dialed in
   1 million yuan
Not dialed
    0.00 million
Total actual use of funds
140,000 yuan
Â
Phase results
1. On the completed construction of the new project "Electromagnetic Compatibility Experimental Device for Flow Meters", the experimental research on real-flow reliability evaluation of electromagnetic interference performance of flow meters is being carried out. 2. Large tonnage electronic scales for large-tonnage mass method water flow standard devices are being selected. 3. Authorized 2 invention patents, published 1 paper, and led the completion of 1 Zhejiang Manufacturing Group Standard (Enterprise Standard).
Â
Â
Â
Budget expenditure
Equipment costs
0.00 million
material fee
140,000 yuan
Â
Â
Testing laboratory processing fee
0.00 million
Fuel power costs
0.00 million
Â
Â
Travel expenses
0.00 million
conference fee
0.00 million
Â
Â
Collaborative research and exchange fees
0.00 million
Service fee
0.00 million
Â
Â
Publishing / Documentation / Information Dissemination / Intellectual Property Affairs Fee
0.00 million
Expert consulting fee
0.00 million
Â
Â
management fee
0.00 million
Â
Â
Â
Large equipment and material names and prices
Â
Â
Final acceptance information
Landmark results achieved
Â
Â
Â
Fund settlement
Research on Field Calibration Device of PM2.5 Automatic Monitor
Project
information
Â
Â
project name
 Research on Field Calibration Device of PM2.5 Automatic Monitor
Project department
Zhejiang Quality and Technical Supervision Bureau
Bear unit
Zhejiang Institute of Metrology
Implementation period
2020-01 to 2021-12
Project leader and team members
Name
job title
employer
Undertake the task
Zhang Jianfeng
mid-level engineer
Zhejiang Institute of Metrology
Design and test of calibration device
Hu Pengbing
mid-level engineer
Zhejiang Institute of Metrology
Calibration device construction and experiment
Yang Ying
mid-level engineer
Zhejiang Environmental Monitoring Center
Field Test
Pan Sunqiang
Deputy Senior Engineer
Zhejiang Institute of Metrology
Design and construction of calibration scheme
Chen Zhemin
Professor-level senior engineer
Zhejiang Institute of Metrology
Calibration scheme design
Liu Sumei
mid-level engineer
Zhejiang Institute of Metrology
Summary of calibration experiments and technical documents
Total funding
     10 million yuan
among them
Appropriation
0.00 million
Other funding
Source and amount
Party B self-raised 10.00 (ten thousand yuan)
budget
Equipment costs
0.00 million
material fee
60 million yuan
Testing laboratory processing fee
35 thousand yuan
Fuel power costs
0.00 million
Travel expenses
Ten thousand yuan
conference fee
Ten thousand yuan
Collaborative research and exchange fees
Ten thousand yuan
Service fee
0.00 million
Publishing / Documentation / Information Dissemination / Intellectual Property Affairs
0.00 million
Expert consulting fee
05,000 yuan
management fee
0.00 million
Â
Â
process
information
Funding in place
Dialed in
   10 million yuan
Not dialed
    0.00 million
Total actual use of funds
0.00 million
Phase results
At this stage, the preliminary scheme and selection of the particle generation device for field calibration are mainly carried out. At present, the following tests and applications have been performed: 1 Using the polystyrene standard material to generate particulate matter. Through experiments, it is found that this method has high cost and unstable concentration Disadvantages; 2 The research on the occurrence of particulate matter in the laboratory has been preliminarily carried out, and a preliminary nozzle atomization test has been made, and the optimization test needs to be continued in the later stage. 3 The existing aerosol generator products have been investigated and selected, which are basically consistent with the needs of other projects. Procurement has been carried out from other projects, and bidding has been completed. After the procurement is in place, relevant tests can be shared.
Â
Â
Budget expenditure
Equipment costs
0.00 million
material fee
0.00 million
Testing laboratory processing fee
0.00 million
Fuel power costs
0.00 million
Travel expenses
0.00 million
conference fee
0.00 million
Collaborative research and exchange fees
0.00 million
Service fee
0.00 million
Publishing / Documentation / Information Dissemination / Intellectual Property Affairs Fee
0.00 million
Expert consulting fee
0.00 million
management fee
0.00 million
Â
Â
Large equipment and material names and prices
High Chromium Ball,High Chromium Casting Ball,High Chrome Cast Iron Ball,High Chrome Steel Ball
SHANDONG SHENGYE GRINDING BALL CO., LTD , https://www.shengysteelball.com