At a high temperature of 36 degrees, passing through the Gobi Desert in the Helan Mountains, the XCA1200 is still like a golden lightning even though the roads are rugged and complex. Even though the road is rugged and complex, the key is that the XCA1200 uses an unprecedented 8,000 tons of eight. Shaft chassis design, its total weight than Jiuqiao products to reduce more than 30 tons. At the same time, the application of the unique oil and gas suspension system and multi-axle steering system in the industry has enabled the XCA1200 to have a stronger pressure bearing capacity, smoother running performance, and more efficient balancing of axle loads.
The world's first eight-axis XCA1200 successful first crane
The XCA1200, which entered the wind farm for the first time, was applauded and praised by the constructors. All construction personnel at the site surrounded the cranes. In the eyes of this group of experts, the design of each detail of the XCA1200 is perfect, and the efficiency of the first installation is even more amazing!
XCA1200 entering the wind farm for the first time
XCA1200 can be changed into a general model and a wind motor type through a combination of modules: wind turbine type has 7 sections of 89.7m main boom, self-folding 25.3m wind power arm plus super-up; general model increase section 8 arm, arm length 102 meters . The mature super-lifting combination arm technology can effectively reduce the deformation of the crane arm, so that the lifting performance and safety performance of the whole machine are greatly improved.
The first hanging scene
At the first hoisting site, everyone did not see the installation of special arms for wind power. Because the 85-meter-high, 45-ton wind power maintenance task was for the XCA1200, the conventional main boom could be easily completed.
XCA1200 giant arm Optimus, when the wind turbine blade docking is completed, a new record will also be born. The world's first eight-axle XCA1200 took the first test of the chopper and successfully completed its mission. On the Gobi Desert, we look forward to challenging the new heights of China's all-terrain cranes with the highest level of XCA1200.
Next, let's take a look at the nine “Qingfeng Warriors†of the Xugong All-terrain Crane Wind Power Family and feel the strength of the Xugong Legion that covers China’s onshore wind turbines.
Qujing, Yunnan
Qujing, Yunnan, QAY650 all-terrain crane innovation, causing CCTV eager attention, and in CCTV2 "feeling made in China" broadcast. Can meet the domestic 2.0 MW and the following wind turbine type installation, QAY650 has become the customer's first choice, at present, dozens of products are distributed in major wind farms in the country.
Qingdao, Shandong
In Qingdao, Shandong, QAY800 has been fighting wind farms for 20 consecutive days. It has been able to overcome the narrow and steep slopes of the road, and the load transfer is extremely efficient. It has greatly reduced customer transfer costs and improved construction efficiency. It has established a good reputation in the lifting field.
Zhanjiang, Guangdong
In Zhanjiang, Guangdong, the QAY1000 all-terrain crane succeeded in accurately positioning the 2.0 MW wind turbine blade, and Xugong’s all-terrain crane's one-kiloton road was another feat. The QAY1000 utilizes advanced arm-mounted self-assembly and disassembly technology as well as a proprietary power unit system and hinged-axis removal and disassembly system. With no auxiliary equipment, the QAY1000 can be assembled in a very short time.
Fuzhou, Fujian
Fuzhou, Fujian, beautiful coastline. The QAY1200 became the most beautiful scenery on the screen. The appearance of the QAY1200 marks China's all-terrain cranes entering the top ranks of the world. Superior environmental adaptability and operational stability, opening up the "world's best" made in China!
Wulanchabu, Inner Mongolia
In Wulanchabu of Inner Mongolia, the XCA5000, the world's largest tonnage all-terrain crane, turned out at 30 degrees Celsius. Since then, China's all-terrain cranes have been able to independently complete land-based installation of 3.0 megawatts of wind power. After ten years of sharpening, XCMG cranes have always been meticulously casting "technical leading, do not destroy" products, and truly contribute a world-class brand of construction machinery from China.
Jilin Baicheng
In Baicheng, Jilin, the silent QAY500 all-terrain crane stands in cold winter with a low-key posture and tough quality. Even surrounded by ice and snow, it still contributes the most energy and becomes the safety guard of 1.5 MW wind power.
Inner Mongolia Plateau
In the Inner Mongolia Plateau, the G-generation XCA450 all-terrain crane unveiled a 1.5-megawatt wind farm with new technology. The four characteristics of “smart technology, green energy, quality performance, and ultra-high performance†will open a new wind power hoisting value experience.
Yantai, Shandong
Yantai, Shandong, XCA550 interpretation of unparalleled large-scale wind power. Two wind turbines with different positions completed in 3 days; 40 degrees above gradient, easy to carry through; at extreme wind speeds, excellent hoisting stability is exhibited. This efficiency has become the focus of much attention.
Originated in Xugong, succeeded in Xugong
From the first QAY25 all-terrain crane to the world's first eight-axis XCA1200, every upgrade of China's crane industry technology originated from XCMG and succeeded by XCMG. In exploring and practising the development of China's construction cranes, XCMG, which sticks to its main business and unswervingly depends on its core technology, is once again embarking on a new peak in global construction cranes! (This article is from Xugong)
Mobile dock leveler is used in places where there is no loading and unloading platform or goods need to be loaded and unloaded. If there is no loading and unloading platform at the logistics site, as a remedial measure, the mobile boarding bridge is one of the most suitable solutions. The mobile boarding bridge is equivalent to a moving steel slope, and the forklift can also directly drive into the truck compartment for batch loading and unloading. The safe and rapid loading and unloading of goods can be realized only by one person without power supply.
1. Full hydraulic drive, easy operation and reliable operation.
2. The lip plate and the platform are connected by a long shaft, with high strength and good reliability.
3. Imported seals are adopted to ensure that the hydraulic system has excellent sealing performance.
4. Imported integral modular hydraulic station is adopted, with good sealing performance and long service life.
5. The design of high-strength "U" shaped beam can ensure its high load and long-term operation without deformation.
6. The anti-skid pattern steel plate is adopted to make the platform have good anti-skid performance.
7. Both sides shall be provided with anti rolling skirt plates to prevent accidental injury caused by toes extending into the platform.
8. Support rods are provided to ensure the safety of maintenance personnel when entering the boarding bridge for maintenance
Heavy-Steel Loading Dock,Hydraulic Loading Dock Ramp,Mobile Loading Docks,Portable Loading Docks
zhongcan machinery Co.,Ltd , https://www.zclift.com